Warning: Creating default object from empty value in /home/ptgut/public_html/include/content.php(121) : eval()'d code on line 1

Warning: Creating default object from empty value in /home/ptgut/public_html/include/content.php(121) : eval()'d code on line 1

Warning: Creating default object from empty value in /home/ptgut/public_html/include/content.php(121) : eval()'d code on line 1

Warning: Creating default object from empty value in /home/ptgut/public_html/include/content.php on line 155

Strict Standards: Only variables should be passed by reference in /home/ptgut/public_html/include/template.php on line 1471

Strict Standards: Only variables should be passed by reference in /home/ptgut/public_html/include/template.php on line 1471

Strict Standards: Only variables should be passed by reference in /home/ptgut/public_html/include/template.php on line 1471

Strict Standards: Only variables should be passed by reference in /home/ptgut/public_html/include/template.php on line 1471
PT. GRAHA USAHA TEKNIK
News
Sabtu, 19 Jun 2010
CPP and AUP Ujung Pangkah Field Project
After one month tendering process from assesment up to final negotiation, finally, Dr. Samad Solbai, the Director of PT Gunanusa Utama Fabricators awards PTGUT to participate on Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP) Ujung Pangkah Field, owned by HESS.

Mid of June 2010, the contract signed. PT Graha Usaha Teknik should perform Construction and Commissioning of Electrical, Instrumentation and Telecommunication Work. Job location will be done at PT Gunanusa Utama Fabricators' Cilegon Shipyard and at field site, Ujung Pangkah, Gresik East Java during Hook Up stage.

CPP has a 2650 tonnes upper deck with an 260 tonnes jacket, the platform consists of processing module, gas/liquid separation, gas compression, liquids pumping and produced water handling, water treatment and disposal.

AUP has a topsides weight of 2080 tonnes with a 260 tonnes jacket. AUP will accommodate 35 persons and a Control Building located on the Cellar Deck which is comprised of the Motor Control Centre (MCC) room, Transformer Room, Local Equipment Room (LER) and workshops area.

More about :
*-- PT Gunanusa Utama Fabricators
*-- HESS Pangkah Gas Processing Facility
Other News
Selasa, 06 Sep 2011
GUT passed OHSAS 18001:2007 Certification
Jumat, 25 Jun 2010
PT Graha Usaha Teknik certified as an ISO 9001:2008 company
Rabu, 05 Mar 2008
PT Graha Usaha Teknik has been awarded a contract to perform Engineering, Procurement, Supply and Construction (EPSC) of Electrical work
 
We are willing to cooperate with you on mutual benefit for your satisfaction
Copyright © 2008, PT. Graha Usaha Teknik
All Rights Reserved
Jl. Asem Baris Raya No.100A
Kebon Baru, Tebet Jakarta 12830 Indonesia
Tel: +62-21-83787333, Fax: +62-21-83787222, email: info at ptgut dot co dot id