Sinohydro 2x100MW CFSPP Bengkulu

Construction and commissioning 150kV GIS (NHVS) 7 bays and 230m GIL, 150kV AIS 2 bays in PLN site (Pulau Bai), steel structure, OHL & DC system.

Fasilitas energi sebagai konteks pengalaman proyek PT GUT.

Ringkasan proyek

Project register mencatat construction and commissioning 150kV GIS (NHVS) 7 bays and 230m GIL, 150kV AIS 2 bays in PLN site (Pulau Bai), steel structure, OHL & DC system pada Sinohydro 2x100MW CFSPP Bengkulu, dengan end-user PT Tenaga Listrik Bengkulu, dipesan melalui NE Electric.

Scope pekerjaan

Construction and commissioning 150kV GIS (NHVS) 7 bays and 230m GIL, 150kV AIS 2 bays, steel structure, OHL & DC system.

Kapabilitas terkait

  • Engineering, Procurement, Construction & Commissioning
  • Electrical