Substation & Transmission Line
150kV Substation & MV System for Mulia Glass
Installation of 150kV Hybrid Pass-Mo, 2 bays pada Mulia Glass.
项目摘要
Project register mencatat installation of 150kV Hybrid Pass-Mo, 2 bays pada 150kV Substation & MV System for Mulia Glass, dengan end-user PT Mulia Glass, dipesan melalui PT ABB Sakti Industri.
工作范围
Installation of 150kV Hybrid Pass-Mo, 2 bays.
相关能力
- Electrical