Substation & Transmission Line
Payoselincah 150kV Hybrid Pass-Mo Installation
Installation of 150kV Hybrid Pass-Mo, 2 bays, 60MVA transformer, MV cable & termination pada Payoselincah.
项目摘要
Project register mencatat installation of 150kV Hybrid Pass-Mo, 2 bays, 60MVA transformer, MV cable & termination pada Payoselincah, dengan end-user PT Siantar, dipesan melalui PT ABB Sakti Industri.
工作范围
Installation of 150kV Hybrid Pass-Mo, 2 bays, 60MVA transformer, MV cable & termination.
相关能力
- Electrical