Power Plant
PLTU Jawa 9 & 10 Suralaya Banten
2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, Isolated Phase Busduct (DAQO), electrical construction and testing/commissioning.
Project summary
Project register mencatat pekerjaan 2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, dan Isolated Phase Busduct (DAQO) pada PLTU Jawa 9 & 10 Suralaya Banten, dengan end-user PT Indo Raya Tenaga dan Doosan Enerbility, dipesan melalui Donghwa Electric Engineering.
Work scope
2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, Isolated Phase Busduct (DAQO), electrical construction and testing/commissioning.
Related capabilities
- Engineering, Procurement, Construction & Commissioning
- Electrical
- Instrumentation