PLTU Jawa 9 & 10 Suralaya Banten

2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, Isolated Phase Busduct (DAQO), electrical construction and testing/commissioning.

Fasilitas energi sebagai konteks pengalaman proyek PT GUT.

Ringkasan proyek

Project register mencatat pekerjaan 2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, dan Isolated Phase Busduct (DAQO) pada PLTU Jawa 9 & 10 Suralaya Banten, dengan end-user PT Indo Raya Tenaga dan Doosan Enerbility, dipesan melalui Donghwa Electric Engineering.

Scope pekerjaan

2x GSUT 500/28.35kV 1370MVA, 4x Aux Transformer 60MVA, 2x GCB, Isolated Phase Busduct (DAQO), electrical construction and testing/commissioning.

Kapabilitas terkait

  • Engineering, Procurement, Construction & Commissioning
  • Electrical
  • Instrumentation