Skip to content

Power Plant

KALSEL 2x100 MW Coal Fired Power Plant Tanjung Tabalong

Electrical and C&I work Balance of Plant pada KALSEL 2x100 MW Coal Fired Power Plant, Tanjung Tabalong, South Kalimantan.

Fasilitas energi sebagai konteks pengalaman proyek PT GUT.

Ringkasan proyek

Project register mencatat pekerjaan electrical and C&I work Balance of Plant pada KALSEL 2x100 MW Coal Fired Power Plant, Tanjung Tabalong, South Kalimantan, dengan end-user PT Tanjung Power Indonesia, dipesan melalui Hyundai Engineering. Scope EPCC proyek yang sama juga mencakup pekerjaan foundation: switchyard foundation (5 bays), substation extension foundation (2 bays), transmission line tower foundation (15 towers), transmission line crossing gantry foundation (2 sets), substation drainage, 20kV transmission line pole foundation (7km), water pump house foundation, dan raw water transfer pipe line foundation (7km), tercatat pada tabel Substation and Transmission Line project register.

Scope pekerjaan

Electrical and C&I work Balance of Plant; EPCC scope also covers switchyard, substation extension, and transmission line tower foundation works.

Kapabilitas terkait

  • Engineering, Procurement, Construction & Commissioning
  • Electrical
  • Instrumentation

Galeri